| No | Thumbnail. | Title | Owner | Categories |
|---|---|---|---|---|
| 1 |
|
Technologies to construct a dam | Japan Water Agency | Dam Body Construction Affiliated Works Construction Phase |
| 3 |
|
The Ara River System Urayama Dam | Japan Water Agency | Dam Body Construction O & M Phase Flood Control Drought Management Culture & Heritege Recreation & Tourism |
| 5 |
|
Tokuyama Dam | Japan Water Agency | Dam Body Construction |
| 10 |
|
Terauchi Dam | Japan Water Agency | Dam Body Construction Facilities & Equipment O & M Phase Recreation & Tourism |
| 27 |
Narration:N/A Telop:JP
|
Record at the time of dam construction | Dam Body Construction Affiliated Works Culture & Heritege | |
| 37 |
Narration:EN Telop:EN
|
Yanba Damー70-year Rerationship Between People and the Dam | Dam Body Construction Surveys & Studies Phase Construction Phase Culture & Heritege | |
| 39 |
|
Explanatory Material on the Yanba Dam | Dam Body Construction Surveys & Studies Phase Construction Phase Flood Control Culture & Heritege Recreation & Tourism | |
| 44 | https://www.hkd.mlit.go.jp/ky/ki/kouhou/copy_of... | Until Sanru Dam is built | Until Sanru Dam is built | Dam Body Construction |
| 45 |
Narration:JP Telop:N/A
|
fruitful and shining future-Record until the completion of Omu Dam- | Dam Body Construction Affiliated Works For Students | |
| 46 |
Narration:JP Telop:N/A
|
Mizukubo Dam (construction record) | Dam Body Construction | |
| 47 |
Narration:JP Telop:N/A
|
Shintsuruko Dam | Dam Body Construction Construction Phase O & M Phase | |
| 48 |
Narration:JP Telop:N/A
|
Nicchuu Dam (construction record) | Dam Body Construction | |
| 49 |
Narration:JP Telop:N/A
|
Nisyounai Dam | Dam Body Construction | |
| 50 |
Narration:JP Telop:N/A
|
Aratozawa Dam (construction record) | Dam Body Construction Construction Phase Dam Operation Model Experiments | |
| 51 |
Narration:JP Telop:N/A
|
Moisturize the Soso Oogaki Dam (construction record) | Dam Body Construction Affiliated Works Construction Phase | |
| 52 |
Narration:JP Telop:N/A
|
Yomasari Dam -construction record- | Dam Body Construction Construction Phase | |
| 53 |
Narration:JP Telop:N/A
|
Aoba lake -Yomasari Dam's mission and role- | Dam Body Construction Affiliated Works Surveys & Studies Phase Culture & Heritege | |
| 55 |
Narration:N/A Telop:N/A
|
1997 Sannoukai Dam construction | Dam Body Construction Construction Phase | |
| 56 |
Narration:JP Telop:N/A
|
The story of Sannoukai Dam | Dam Body Construction | |
| 59 |
Narration:JP Telop:N/A
|
Water of grace given by the dam -State-owned Mabechi River coastal agricultural irrigation project- | Dam Body Construction Affiliated Works Facilities & Equipment Construction Phase Natural Environment Biological Conservation For Kids For Students | |
| 60 |
Narration:N/A Telop:N/A
|
Shinmiyakawa Dam Precast inspection corridor construction status | Dam Body Construction Precast Inspection Galleries Others | |
| 61 |
Narration:JP Telop:N/A
|
Shinmiyakawa Dam that Create a water source・Construction① | Dam Body Construction Construction Phase | |
| 62 |
Narration:JP Telop:N/A
|
Until the Shinmiyakawa Dam is built -Centering on the RCD method- | Dam Body Construction Affiliated Works Surveys & Studies Phase Construction Phase For Students | |
| 63 |
Narration:JP Telop:N/A
|
Keep looking at the future in the nature of Aizu Shinmiyakawa Dam | Dam Body Construction Construction Phase For Students | |
| 64 |
Narration:N/A Telop:N/A
|
Kanezawa regulating reservoir Situation of external concrete placeme | Dam Body Construction Others | |
| 65 |
Narration:JP Telop:N/A
|
Large rockfill dam turns the Hino River basin into an oasis Masutani Dam | Dam Body Construction Facilities & Equipment Surveys & Studies Phase Construction Phase For Students For Professionals Animation & CG | |
| 73 |
|
Overview of the State Government-Managed Project for Farming Irrigation along the Naka River | Dam Body Construction Facilities & Equipment For Students | |
| 85 |
Narration:JP Telop:N/A
|
History of Shimanose Dam construction | Kinki Regional Agricultural Administration Office | Dam Body Construction Construction Phase For Students For Professionals |
| 86 |
Narration:JP Telop:N/A
|
Zaou Dam on the Hino River | Kinki Regional Agricultural Administration Office | Dam Body Construction Construction Phase For Students For Professionals |
| 87 |
Narration:JP Telop:N/A
|
Yasugawa Dam~Large renovation of Heisei~ | Kinki Regional Agricultural Administration Office | Dam Body Construction Construction Phase For Students For Professionals |
| 88 |
Narration:JP Telop:N/A
|
Kamitsu Dam-Moisturizes the land of the gods- | Kinki Regional Agricultural Administration Office | Dam Body Construction Construction Phase For Students For Professionals |
| 89 |
Narration:JP Telop:N/A
|
History of construction of Kodamata Dam | Dam Body Construction Affiliated Works Facilities & Equipment Construction Phase For Students | |
| 90 |
Narration:JP Telop:N/A
|
Sakane Dam-For affluent agriculture- | Dam Body Construction Affiliated Works Facilities & Equipment Construction Phase For Students | |
| 91 |
Narration:JP Telop:N/A
|
Construction of the opening Sera Earth Metani Dam | Dam Body Construction Affiliated Works Facilities & Equipment Construction Phase For Students | |
| 92 |
Narration:EN Telop:N/A
|
Construction of the opening Sera Earth Metani Dam (English version) | Dam Body Construction Affiliated Works Facilities & Equipment Construction Phase For Students | |
| 93 |
Narration:JP Telop:N/A
|
Lake Koryu-State-owned Hiroshima Central Plateau Agricultural Land Development Project-Record of Kyomaru Dam Construction | Dam Body Construction Affiliated Works Facilities & Equipment Construction Phase For Students | |
| 94 |
Narration:JP Telop:N/A
|
To the next generation of water, Dogo Plain, a state-owned road-Sako Dam- | Dam Body Construction Affiliated Works Facilities & Equipment Construction Phase For Students | |
| 96 |
|
KEPCO’s Approach for Integrated Sediment Flow Management in the Mimikawa River Basin | KYUSHU ELECTRIC POWER CO | Dam Body Construction Construction Phase Flood Control Dam Operation Advanced Technologies Biological Conservation Water Quality For Professionals |
| 97 |
Narration:N/A Telop:JP
|
Construction record of Kamishiba Dam, Japan's first authentic arch dam | KYUSHU ELECTRIC POWER CO | Dam Body Construction Facilities & Equipment |
| 98 |
Narration:N/A Telop:JP
|
Japan's first modern mechanized construction dam ~ Tsukabaru Dam ~ | KYUSHU ELECTRIC POWER CO | Dam Body Construction Facilities & Equipment |
| 118 |
|
Renovation of Taishakugawa Dam (Shin-Taishakugawa Power Station Project) | The Chugoku Electric Power Company, Incorporated | Dam Body Construction Affiliated Works Facilities & Equipment Surveys & Studies Phase Construction Phase Dam Upgrading Advanced Technologies Model Experiments Natural Environment Biological Conservation Release from Dams For Students For Professionals |
| 125 |
|
KYOGOKU PROJECT | Hokkaido Electric Power Co.,Inc. | Dam Body Construction Construction Phase For Professionals |
| 126 |
|
KYOGOKU PROJECT | Hokkaido Electric Power Co.,Inc. | Dam Body Construction Construction Phase Natural Environment Biological Conservation For Professionals |
| 127 |
Narration:EN Telop:N/A
|
KYOGOKU PROJECT | Hokkaido Electric Power Co.,Inc. | Dam Body Construction Construction Phase Natural Environment Biological Conservation For Professionals |
| 128 |
Narration:JP Telop:N/A
|
KYOGOKU PROJECT | Hokkaido Electric Power Co.,Inc. | Dam Body Construction Construction Phase Natural Environment Biological Conservation For Professionals |
| 137 |
|
SusobanaDamu explanation | Nagano Prefecture | Dam Body Construction Facilities & Equipment O & M Phase |
| 138 |
|
Oku-SusobanaDamu explanation | Nagano Prefecture | Dam Body Construction Facilities & Equipment O & M Phase |
| 144 |
Narration:JP Telop:JP
|
Inaba dam construction record video | Oita Prefecture | Dam Body Construction Construction Phase Advanced Technologies For Students For Professionals |
| 145 |
Narration:JP Telop:JP
|
Gyonyu dam construction record video | Oita Prefecture | Dam Body Construction Facilities & Equipment Construction Phase For Students For Professionals |
| 146 |
Narration:N/A Telop:JP
|
Notsu dam construction record video | Oita Prefecture | Dam Body Construction Construction Phase For Students For Professionals |
| Thumbnail. Title |
|---|
|
|
|
|
|
|
|
|
|
Narration:N/A Telop:JP
Record at the time of dam construction |
|
Narration:EN Telop:EN
Yanba Damー70-year Rerationship Between People and the Dam |
|
|
|
https://www.hkd.mlit.go.jp/ky/ki/kouhou/copy_of...
Until Sanru Dam is built |
|
Narration:JP Telop:N/A
fruitful and shining future-Record until the completion of Omu Dam- |
|
Narration:JP Telop:N/A
Mizukubo Dam (construction record) |
|
Narration:JP Telop:N/A
Shintsuruko Dam |
|
Narration:JP Telop:N/A
Nicchuu Dam (construction record) |
|
Narration:JP Telop:N/A
Nisyounai Dam |
|
Narration:JP Telop:N/A
Aratozawa Dam (construction record) |
|
Narration:JP Telop:N/A
Moisturize the Soso Oogaki Dam (construction record) |
|
Narration:JP Telop:N/A
Yomasari Dam -construction record- |
|
Narration:JP Telop:N/A
Aoba lake -Yomasari Dam's mission and role- |
|
Narration:N/A Telop:N/A
1997 Sannoukai Dam construction |
|
Narration:JP Telop:N/A
The story of Sannoukai Dam |
|
Narration:JP Telop:N/A
Water of grace given by the dam -State-owned Mabechi River coastal agricultural irrigation project- |
|
Narration:N/A Telop:N/A
Shinmiyakawa Dam Precast inspection corridor construction status |
|
Narration:JP Telop:N/A
Shinmiyakawa Dam that Create a water source・Construction① |
|
Narration:JP Telop:N/A
Until the Shinmiyakawa Dam is built -Centering on the RCD method- |
|
Narration:JP Telop:N/A
Keep looking at the future in the nature of Aizu Shinmiyakawa Dam |
|
Narration:N/A Telop:N/A
Kanezawa regulating reservoir Situation of external concrete placeme |
|
Narration:JP Telop:N/A
Large rockfill dam turns the Hino River basin into an oasis Masutani Dam |
|
|
|
Narration:JP Telop:N/A
History of Shimanose Dam construction |
|
Narration:JP Telop:N/A
Zaou Dam on the Hino River |
|
Narration:JP Telop:N/A
Yasugawa Dam~Large renovation of Heisei~ |
|
Narration:JP Telop:N/A
Kamitsu Dam-Moisturizes the land of the gods- |
|
Narration:JP Telop:N/A
History of construction of Kodamata Dam |
|
Narration:JP Telop:N/A
Sakane Dam-For affluent agriculture- |
|
Narration:JP Telop:N/A
Construction of the opening Sera Earth Metani Dam |
|
Narration:EN Telop:N/A
Construction of the opening Sera Earth Metani Dam (English version) |
|
Narration:JP Telop:N/A
Lake Koryu-State-owned Hiroshima Central Plateau Agricultural Land Development Project-Record of Kyomaru Dam Construction |
|
Narration:JP Telop:N/A
To the next generation of water, Dogo Plain, a state-owned road-Sako Dam- |
|
|
|
Narration:N/A Telop:JP
Construction record of Kamishiba Dam, Japan's first authentic arch dam |
|
Narration:N/A Telop:JP
Japan's first modern mechanized construction dam ~ Tsukabaru Dam ~ |
|
|
|
|
|
|
|
Narration:EN Telop:N/A
KYOGOKU PROJECT |
|
Narration:JP Telop:N/A
KYOGOKU PROJECT |
|
|
|
|
|
Narration:JP Telop:JP
Inaba dam construction record video |
|
Narration:JP Telop:JP
Gyonyu dam construction record video |
|
Narration:N/A Telop:JP
Notsu dam construction record video |