| No | Thumbnail. | Title | Owner | Categories |
|---|---|---|---|---|
| 6 |
|
Iwaya Dam | Japan Water Agency | Facilities & Equipment O & M Phase Dam Operation Natural Environment Recreation & Tourism |
| 7 |
|
Agigawa Dam | Japan Water Agency | Facilities & Equipment O & M Phase Dam Operation Natural Environment Water Quality Recreation & Tourism |
| 11 |
Narration:JP Telop:EN
|
Flood Control Operation | Japan Water Agency | Flood Control Dam Operation |
| 18 |
Narration:N/A Telop:JP
|
2020 Ikari Dam Environmental Release Tour | Kinugawa Integrated Dam Control Office, Kanto Regional Development Bureau, MLIT | O & M Phase Dam Operation Release from Dams |
| 19 |
Narration:N/A Telop:JP
|
2020 Kinugawa upstream dam group inspection release record | Kinugawa Integrated Dam Control Office, Kanto Regional Development Bureau, MLIT | Facilities & Equipment O & M Phase Inspection Dam Operation Release from Dams For Students Drone |
| 41 |
|
Amagase Dam | Facilities & Equipment Flood Control Dam Operation Natural Environment Recreation & Tourism | |
| 43 |
|
Tono Dam -Pyramid of th heisei Period- | Tono Dam Reservoir and Management Office, Chugoku Regional Dvelopment Bureau, MLIT | Facilities & Equipment Flood Control Dam Operation Advanced Technologies Natural Environment Culture & Heritege |
| 50 |
Narration:JP Telop:N/A
|
Aratozawa Dam (construction record) | Dam Body Construction Construction Phase Dam Operation Model Experiments | |
| 82 |
Narration:N/A Telop:N/A
|
Takihata Soundscape | Osaka Pref. | Facilities & Equipment Dam Operation Natural Environment Release from Dams Others |
| 96 |
|
KEPCO’s Approach for Integrated Sediment Flow Management in the Mimikawa River Basin | KYUSHU ELECTRIC POWER CO | Dam Body Construction Construction Phase Flood Control Dam Operation Advanced Technologies Biological Conservation Water Quality For Professionals |
| 123 |
|
Hydoropower Plant of Kansai Electric Power Co. | KEPCO THE KANSAI ELECTRIC POWER CO., INC. | Facilities & Equipment Construction Phase O & M Phase Dam Operation Natural Environment Biological Conservation Culture & Heritege For Professionals |
| 124 |
|
Sustainable Hydropower Development | KEPCO THE KANSAI ELECTRIC POWER CO., INC. | Affiliated Works Facilities & Equipment Construction Phase O & M Phase Dam Operation Natural Environment Culture & Heritege For Professionals |
| 134 |
Narration:JP Telop:N/A
|
The role of the Ichifusa dam and abnormal flood disaster prevention operation | Facilities & Equipment O & M Phase Flood Control Dam Operation Release from Dams For Students |