2 |
|
The Ara River System
Takizawa Dam |
Japan Water Agency |
O & M Phase
Flood Control
Drought Management
Natural Environment
|
3 |
|
The Ara River System
Urayama Dam |
Japan Water Agency |
Dam Body Construction
O & M Phase
Flood Control
Drought Management
Culture & Heritege
Recreation & Tourism
|
11 |
Narration:JP Telop:EN
|
Flood Control Operation |
Japan Water Agency |
Flood Control
Dam Operation
|
39 |
|
Explanatory Material on the Yanba Dam |
|
Dam Body Construction
Surveys & Studies Phase
Construction Phase
Flood Control
Culture & Heritege
Recreation & Tourism
|
40 |
|
Integrated Management of Tonegawa Dam group |
|
O & M Phase
Flood Control
Drought Management
Release from Dams
|
41 |
|
Amagase Dam |
|
Facilities & Equipment
Flood Control
Dam Operation
Natural Environment
Recreation & Tourism
|
42 |
|
For an even more advanced water management of the Yodo River System Outline of Our Activities |
|
Affiliated Works
Flood Control
Drought Management
|
43 |
|
Tono Dam -Pyramid of th heisei Period- |
Tono Dam Reservoir and Management Office, Chugoku Regional Dvelopment Bureau, MLIT |
Facilities & Equipment
Flood Control
Dam Operation
Advanced Technologies
Natural Environment
Culture & Heritege
|
74 |
Narration:N/A Telop:JP
|
Outline of the Anou Dam |
Mie Pref. |
Facilities & Equipment
Construction Phase
O & M Phase
Flood Control
Drought Management
Inspection
Repairs
Release from Dams
Recreation & Tourism
For Students
Small Hydropower
Others
|
96 |
|
KEPCO’s Approach for Integrated Sediment Flow Management in the Mimikawa River Basin |
KYUSHU ELECTRIC
POWER CO |
Dam Body Construction
Construction Phase
Flood Control
Dam Operation
Advanced Technologies
Biological Conservation
Water Quality
For Professionals
|
134 |
Narration:JP Telop:N/A
|
The role of the Ichifusa dam and abnormal flood disaster prevention operation |
|
Facilities & Equipment
O & M Phase
Flood Control
Dam Operation
Release from Dams
For Students
|